Switzerland and the Principality of Liechtenstein
Radio Interface Regulation

784.101.21 / RIR08061)
FSS Earth stations

RIR0806-22
NGSO ES
14.00 - 14.50 GHz
Fixed earth stations operating with NGSO FSS
Edition 2.0 / 01.01.2022

Nr Parameter2)DescriptionComments
1Radiocommunication serviceFixed-satellite-
2ApplicationFSS Earth stationsFixed Earth stations operating with NGSO FSS systems with antennas that track continuously the satellites.
3Frequency band14.00 - 14.50 GHzReceive frequency bands (space-to-Earth): 10.70 – 12.75 GHz.
The receive band 10.7 - 11.7 GHz is co-primary used with the FS under the terms of sufficient geographical separation and uncoordinated FSS Earth stations operate in this band on a non-protected basis.
4Channelling--
5Modulation / Occupied bandwidth--
6Direction / Separation--
7Transmit power / Power densitymax. 60 dBW e.i.r.p.Additional restrictions according to ECC/DEC/(17)04 Annex 1.
8Channel access and occupation rulesAccording to ECC/DEC/(17)04-
9Authorisation regimeSwitzerland: License exempt.
Liechtenstein: No individual assignment required.
Switzerland: Terminals are license exempt on the condition that the terminals are under the control of a network for which a valid spectrum license for the Swiss territory is required.
Liechtenstein: The exemption from the individual licensing requirement only applies subject to a valid license for the Liechtenstein territory that includes the use of individual customer terminals.
10Additional essential requirements--
11Frequency planning assumptionsEN 303 980 or EN 303 981, ECC/DEC/(17)04.-
12Planned changes--
13ReferenceEN 303 980 or EN 303 981 / ECC/DEC/(17)04 /-.Effective use of spectrum / ECC Decisions / ECC Recommendations.
14Notification numberG/TBT/N/CHE/262
2021/9504/CH
-
15RemarksEN 301 489-20. ECC Report 271, ECC Report 272.-

Normative part: 1 to 11
Informative part: Nr 12 to 15

1) RIR for similar and/or other applications are available under: https://www.bakom.admin.ch/bakom/en/home/frequenzen-antennen/nationaler-frequenzzuweisungsplan/schnittstellen-anforderungen.html
2) For explanations and legal status, please refer to basis document 784.101.21 / RIR0000