Switzerland and the Principality of Liechtenstein
Radio Interface Regulation

784.101.21 / RIR08061)
FSS Earth stations

RIR0806-01
SNG
12.75 - 14.5 GHz
Satellite News Gathering Transportable Earth Stations (SNG TES)
Edition 8.0 / 01.01.2022

Nr Parameter2)DescriptionComments
1Radiocommunication serviceFixed-satellite (Earth-to-space)-
2ApplicationSNGSatellite News Gathering Transportable Earth Stations (SNG TES) operating with GSO FSS networks.
3Frequency bandA: 12.75 - 13.25 GHz
B: 13.75 - 14.00 GHz
C: 14.00 - 14.30 GHz
D: 14.30 - 14.50 GHz
The frequency band 12.75 - 13.25 GHz is co-primary used with the FS under the terms of sufficient geographical separation.
Receive frequency bands (space-to-Earth): 10.70 - 11.70 GHz, 12.50 - 12.75 GHz.
The receive band 10.70 - 11.70 GHz is co-primary used with the FS under the terms of sufficient geographical separation and uncoordinated FSS Earth stations operate in this band on a non protected basis.
4Channelling--
5Modulation / Occupied bandwidth--
6Direction / Separation--
7Transmit power / Power density-Defined during individual frequency assignment.
Restrictions on e.i.r.p. according to Radio Regulation Articles 5.502 and 5.503 (Band B: 13.75 - 14.00 GHz).
8Channel access and occupation rules--
9Authorisation regimeSwitzerland: License required.
Liechtenstein: Individual assignment required.
-
10Additional essential requirements--
11Frequency planning assumptionsEN 301 430-
12Planned changes--
13ReferenceEN 301 430 / ERC/DEC/(00)08 / ERC/REC 13-03.Effective use of spectrum / ECC Decisions / ECC Recommendations.
14Notification numberG/TBT/N/CHE/262
2021/9504/CH
-
15RemarksEN 301 489-12-

Normative part: 1 to 11
Informative part: Nr 12 to 15

1) RIR for similar and/or other applications are available under: https://www.bakom.admin.ch/bakom/en/home/frequenzen-antennen/nationaler-frequenzzuweisungsplan/schnittstellen-anforderungen.html
2) For explanations and legal status, please refer to basis document 784.101.21 / RIR0000