Switzerland and the Principality of Liechtenstein
Radio Interface Regulation

784.101.21 / RIR03011)
Point-to-Multipoint

RIR0301-01
Point-to-Multipoint
3410 - 3600 MHz
P - MP public
Edition 5.0 / 01.08.2018

Nr Parameter2)DescriptionComments
1Radiocommunication serviceFixed-
2ApplicationPoint-to-MultipointP - MP public.
3Frequency bandA: 3410.0 - 3494.0 MHz
B: 3510.0 - 3594.0 MHz
Refer to RIR0301-03 for BWA applications.
4Channelling3.5 MHz / 7.0 MHz / 14 MHzMin and Max channel center frequencies [MHz]
3.5 MHz BW: n min = 1: F low = 3411.750, F high = 3511.750
3.5 MHz BW: n max = 24: F low = 3492.250, F high = 3592.250
7.0 MHz BW: n min = 1: F low = 3413.500, F high = 3513.500
7.0 MHz BW: n max = 12: F low = 3490.500, F high = 3590.500
14 MHz BW: n min = 1: F low = 3417.000, F high = 3517.000
14 MHz BW: n max = 6: F low = 3487.000, F high = 3587.000
(n... according to CEPT/ERC/REC 14-03, Annex B)
5Modulation / Occupied bandwidthDigital-
6Direction / Separation100 MHzThe central station TX has to operate in the high band
7Transmit power / Power densityMax. 35 dBW e.i.r.p.-
8Channel access and occupation rules--
9Authorisation regimeSwitzerland: License required.
Liechtenstein: Individual assignment required.
Max. power flux density at boarder areas according to provisions in the license / individual assignment.
10Additional essential requirements--
11Frequency planning assumptionsEN 302 326-1, EN 302 326-3.Horizontal or vertical antenna polarisation.
Max. Out of band spectral power flux density = -45 dB referred to the nominal power flux density, measured at the 2 frequencies: fa = f1 - 14 MHz and fb = f2 + 14 MHz. (f1 = lower limit, f2 = upper limit of the assigned frequency block)
12Planned changes3500 - 3600 MHz planned for MFCN (IMT).-
13ReferenceEN 302 326-2 /-/ ERC/REC 14-03, Annex B.Effective use of spectrum / ECC Decisions / ECC Recommendations.
14Notification numberG/TBT/N/CHE/102
2008/9503/CH
-
15RemarksEN 301 489-4-

Normative part: 1 to 11
Informative part: Nr 12 to 15

1) RIR for similar and/or other applications are available under: https://www.bakom.admin.ch/bakom/en/home/frequenzen-antennen/nationaler-frequenzzuweisungsplan/schnittstellen-anforderungen.html
2) For explanations and legal status, please refer to basis document 784.101.21 / RIR0000